Petrofac
Petrofac is seeking a Principal Instrument Designer – Contractor for12 months based in Aberdeen, UK.
The role is outside IR35 and we invite Limited Companies to engage.
Scope of Services:
Scope of Services:
- Provide design input to estimates for project work scopes
- Provide input to progress and planning meetings
- Provide technical design expertise to specify modifications to existing equipment or purchasing new equipment including:
o DCS, ESD F&G and Metering system modifications
o Field Instrumentation including Pressure, Level, Temperature, Flow and Specialist
o Measurements.
o Valves
o SIL, High Integrity Systems (HIPPS)
o Measurement and Metering
o Industrial Networking and Communications
- Provide technical design expertise to the resolution of technical queries ensuring that all design changes are captured by the change control process
- To be able to conduct site surveys on offshore or onshore assets
- To be able to produce calculations required for the role and participate in design reviews.
- Production of discipline documentation deliverables for inclusion in work packs.
- Provide a level of technical support that satisfies the appropriate Asset Safety Case and that the PFEER performance standards ensuring they are not compromised by any discipline engineering activities
- Compliance with company engineering procedures, industry, international and client codes and standards.
- Ensure that all work complies with the Contract Health, Safety, Environmental and Quality policies and procedures as appropriate.
- Approve dispensations to codes or standards where justified.
Deliverables:
· Block Diagrams or Single line diagrams
· Cause & Effect Diagrams
· Instrument Cable Block Diagram
· Cable Tray Routing & Layout Diagrams
· Panel; Control Room; F&G and Equipment Room Layouts
· Panel Wiring Diagram
· Destruct Drawing
· Instrument Mounting / Support Details
· Logic & Loop Diagrams
· Schematic Diagrams
· Cable Interconnection Diagrams
· Cable; Panel & Junction box Termination Diagram
· Junction Box Termination Diagram
· Pneumatic; Chemical and Hydraulic Hook-up Diagram
· Pneumatic; Chemical and Hydraulic Hook-up Schematic
· Installation or story board diagrams to facilitate understanding
· Cable Schedule
· Requisition – Bulk Bill of Materials
#LI-JN1
To apply for this job please visit petrofac.referrals.selectminds.com.